November 23, 2026
Aerial view of a home with black solar panels on a gray roof next to a backyard pool

A useful solar project comparison uses a sequence of named milestones, with an owner, required inputs, completion evidence and clearly disclosed dependencies for each step. Ask Solar Mike handles design, contracting, permitting coordination and project management for its Utah projects . Compare proposals by examining that sequence—not by choosing the shortest estimate.

This guide gives you a practical worksheet for comparing schedules. You can also review the broader Tesla solar panels guide for Utah homeowners, the battery scope comparison and the Tesla solar and Powerwall cost guide. Bookmark the canonical version of this timeline comparison guide .

What should a credible solar timeline show?

A milestone schedule should answer five questions for every stage:

  1. What is the deliverable? Name the record or document that marks the stage complete.
  2. What happens next? Name the next action clearly.
  3. What information is required? Missing documents should appear as visible dependencies rather than hidden assumptions.
  4. What proves completion? Request a receipt, approved document, status record or other evidence appropriate to that milestone.
  5. What can pause the sequence? The proposal should identify unresolved decisions without disguising them as fixed dates.

This approach does not require a contractor to predict another organization’s response date. It does require the proposal to distinguish work that is ready, work that is waiting and work that has not started.

Which milestones should you compare?

Use the same milestone names across every proposal. If one company combines several steps into a vague label such as “processing,” ask it to separate the work so you can compare like with like.

MilestoneWhat to askEvidence to request
Utility confirmationWhich utility serves this address, based on an address-level check ?A utility name recorded against the project address
Site informationWhich roof, electrical and equipment details are still needed?A completed site-information record
System designWho reviews the design, and what homeowner decisions remain open?A design package with revision status
Permit coordinationWhat must be submitted, and who tracks responses?A submission receipt and current status
Installation readinessWhich approvals, materials and homeowner preparations must be complete first?A written readiness checklist
InstallationWhat work is included in the planned visit?A written scope matched to the approved design
Commissioning and handoffWhat records will the homeowner receive?Commissioning, registration and monitoring records

Ask Solar Mike states that every system design is produced and reviewed by a licensed engineering firm . Its project handoff includes a commissioning receipt, registration proof, monitoring handoff, a homeowner ownership record, a named escalation path and written change-order control .

Why should the serving utility be confirmed first?

Do not let a proposal infer the utility from a city name or ZIP code. Ask the company to record the serving utility for the exact project address before presenting utility-dependent steps . Utility service in south Utah County varies by address; Payson, Spanish Fork and Salem operate city power in parts of town, SESD serves others, and some locations are served by Rocky Mountain Power .

The comparison question is simple: “What evidence did you use to identify my utility?” If the answer is only a city assumption, mark utility confirmation as unresolved.

How should larger-home electrical design appear in the schedule?

Ask Solar Mike designs for homes with 200A and 400A service panels, while the actual backup architecture is confirmed through site verification and engineering .

For proposal comparison, ask each company to identify:

  • Which service-panel information has been verified?
  • Which loads are being evaluated for backup?
  • Which design decisions are preliminary?
  • Which decisions require site verification or engineering?
  • What event moves the design from preliminary to ready for permitting ?

Do not treat “whole-home backup” as a scheduling milestone by itself. Ask for the equipment scope, backed-up loads and unresolved design conditions to be documented. Household priorities—what you want running first, what can wait and what matters during an outage—are useful design inputs, but they are not a completed engineering design.

How can you compare uncertainty without accepting guesswork?

Create four columns beside every milestone: confirmed, estimated, waiting on another party and not yet evaluated. Then ask the proposal author to place each milestone in one column.

A strong comparison does not reward aggressive dates automatically. It rewards clarity. A schedule is easier to evaluate when it shows:

  • the next action;
  • the person or organization responsible for that action;
  • the information that is still missing;
  • the evidence that closes the milestone; and
  • the process for communicating a change.

If a date changes, ask which underlying assumption changed. This keeps the conversation focused on the project record instead of replacing one unsupported estimate with another.

Who should coordinate the project?

The proposal should name one accountable project contact while still showing the outside decisions that contact cannot control. Ask Solar Mike handles design, contracting, permitting coordination and project management; installation is performed by licensed, insured crews under its Utah contractor license .

Ask Solar Mike is a Utah-licensed general contractor under license 14015846-5501 . It serves homeowners across Utah and focuses on Tesla solar and Powerwall 3 systems . Credential status can also be checked independently: Ask Solar Mike appears in Tesla’s public Certified Installer locator for Powerwall, as checked on August 19, 2026; verify the current status through Tesla’s public installer directory .

Which proposal details deserve follow-up?

  • A single summary with no milestone list: ask for the underlying stages.
  • Utility inferred from the city: ask for address-level utility confirmation .
  • Design presented as complete while electrical questions remain open: ask which conditions will be resolved through site verification and engineering .
  • One status used for two different milestones: request separate records for submission and response.
  • Installation treated as final handoff: ask which commissioning, registration, monitoring and ownership records you will receive.
  • No written change process: ask how changes are documented through written change-order control .

What questions should you ask each solar company?

Can you show every milestone between agreement and homeowner handoff?

Ask for the sequence in writing. Each milestone should name its owner, inputs, current status and completion evidence.

Where are the outside dependencies?

Ask each company to identify which project steps it coordinates. Ask Solar Mike handles design, contracting, permitting coordination and project management .

Has my serving utility been confirmed for my exact address ?

Request the recorded utility name and the basis for that determination. Do not rely only on a city label.

What electrical or backup decisions remain unresolved?

Ask for a list of preliminary assumptions and the event—such as site verification or engineering review—that will resolve each one.

What will I receive when the system is handed over?

Ask for the commissioning, registration, monitoring, ownership and escalation records to be named in the proposal. Ask Solar Mike includes those records in its project handoff .

What is the next step?

Bring your competing proposals to a design conversation and compare their milestone assumptions line by line. You can book a solar design consultation or ask Sarah in the site chat to help organize the questions you want answered. Ask Solar Mike evaluates qualified residential projects in Salt Lake, Utah, Iron and Washington counties; confirm your address and current project fit .

Last reviewed: October 19, 2026. Reviewed by Mike Morris, Founder, Ask Solar Mike .

Back to Blog

Done reading? Put your own house on the page.

A 45-minute Zoom with Mike: what you want to keep running, the Tesla system that fits, your utility's steps and the full price. Bring a recent power bill.

YOUR CITY'S RULEBOOK

Utah has one large utility and dozens of city power departments and co-ops, and the rebate and connection rules change with each. We keep a page for every city we serve.

Your home. Your questions. One useful Zoom.

Mike reviews what you want to keep running, the Tesla system that fits, your utility's steps and the full price. When the project fits and the details are ready, the goal is to make your decision on that call.

  • Have a recent power bill handy. It tells us your utility.
  • Include anyone sharing the decision.
  • Bring your downloaded plan or your biggest question.